post-quantum readiness

Quantum Risk

Mosca inequality applied to the live cryptographic inventory: data lifetime plus migration time versus the modelled arrival of a cryptographically relevant quantum computer. Adjust the model inputs to recalculate.

crqc arrival estimate
2038.5
50% confidence midpoint · simulated
assets failing mosca
5/9
lifetime + migration > arrival
certificates in scope
1,437
discovered · observed
quantum-safe systems
1
hybrid ML-KEM deployed
model inputs

Arrival recalculation

logical qubit scaling rate38% / yr

Derived from published roadmaps across five hardware programmes.

error-correction progress index52

Surface-code overhead reduction relative to the 2025 baseline.

assumed migration duration6 yrs

Enterprise-wide cryptographic replacement, including partner mTLS renegotiation.

cumulative break probability

At the current inputs, a cryptographically relevant machine is more likely than not by 2038.5. Any data that must stay confidential past 2033 needs migration to begin now.

inventory

Cryptographic assets by Mosca shortfall

SystemAlgorithmCertsData lifeMigrationShortfall
Document archive encryptionRecords ManagementAES-256 + RSA transport20484725yplanned+18.5y
Internal PKI rootIdentity ServicesRSA4096320yplanned+13.5y
Code-signing chainPlatform EngineeringRSA4096915ynot started+8.5y
PCI Card Vault HSM wrappingData ProtectionRSA30721412ynot started+5.5y
Interbank Settlement TLSPayments PlatformRSA20482199yplanned+2.5y
Customer messaging E2EEDigital ChannelsML-KEM-768 hybrid768223ycompleteclear
Partner API mTLSIntegration ServicesRSA20481286ynot startedclear
Retail Banking Portal TLSIdentity ServicesECDSA2566112yin progressclear
Branch VPN concentratorsNetwork EngineeringECDH2563841yin progressclear
CQ-01 · Payments Platform

Interbank Settlement TLS

critical
algorithm
RSA 2048
certificates
219
data lifetime
9 yrs
exposure
critical
harvest-now-decrypt-later window
protected to 2035

Traffic captured today stays sensitive until 2035, which is after the 2038.5 arrival midpoint. Migration is planned — this asset fails the inequality under current inputs.